The Olive and Copper Kitchen

The Olive and Copper Kitchen

A Burlingame kitchen opened to the dining room, finished in olive inset cabinetry, patterned tile, and copper-strapped hood.

Category :

Client Name :

The Callahan Family

Location :

The Easton Addition, Burlingame, California

Total Duration :

4 Months

The old plan kept the cook facing a wall. We took walls down to open the kitchen into the dining room, set a beam overhead to carry the span, and rebuilt around one island. Inset olive shaker cabinetry runs floor to ceiling on two walls, topped by marble-look quartz, with white oak paneling and an X detail wrapping the island base.

Nothing was allowed in that did not earn its place. Green cabinetry grounds a room full of daylight, patterned tile carries the pattern load so everything else stays plain, and the island seats three on the family side while the working run stays clear behind it.

Three now sit at the island facing the cook rather than a wall, and the build closed on schedule.

The family asked for one thing above the rest, a range they could cook seriously on. A dual fuel ILVE in cream with brass trim sits centered under a custom hood clad in dark tile and strapped in copper, flanked by a wall-mounted pot filler. Patterned tile runs full height across the cooking wall, and a fireclay farmhouse sink with a bridge faucet and separate pull-down anchors the island.

Continuity was the whole point once the wall came down. Oak flooring runs unbroken from kitchen to dining room, bronze hardware repeats on both, and open plate storage keeps everyday dishes within reach of the sink instead of behind doors.

Handover covered a tested appliance package, sealed stone, adjusted inset doors, and a documented punch list closed inside a week.

Inside This

From conceptualization to final delivery, we provide comprehensive solutions that transform raw potential into refined reality.

What This Kitchen Took

Opening a wall is the easy part to promise and the hard part to detail. Three things carried this build.
The Beam and the Opening

The Beam and the Opening

Removing the kitchen and dining wall meant sizing a beam, setting posts into verified bearing, and getting it reviewed and inspected before any finish work started, which our in-house engineers and crew handled without pulling in an outside structural consultant.

Inset Cabinetry Tolerances

Inset Cabinetry Tolerances

Inset doors show every fraction of error. Walls and floors were corrected before installation, cabinetry was scribed to plaster, and reveals were adjusted at handover, because the flush look only holds if the box behind it is true.

Tile Layout and Hood Fabrication

Tile Layout and Hood Fabrication

The patterned field had to be laid out from the range center so the motif reads whole at the windows and hood, and the hood itself was built and copper-strapped on site to land on that same centerline.

 Frequently Asked Questions

How long does a kitchen remodel like this take?

This one ran 4 months from demolition to final walkthrough, including the structural opening. Most full kitchen remodels at this level land between 14 and 20 weeks. Cabinetry lead time is almost always the constraint, not site labor, so the schedule is largely set the day you approve the cabinet order.

Related Project