The Four-Season Screened Porch

The Four-Season Screened Porch

A screened porch addition in Atherton, built around a stacked stone fireplace under an exposed rafter pine ceiling.

Category :

Client Name :

The Carey Family

Location :

Atherton, California

Total Duration :

4 Months

Everything in this room started at the chimney. A full-height stacked stone stack was built first, carrying a firebox, timber mantel, and flue, and the structure was raised around it. Posts and beams support a vaulted roof finished in tongue-and-groove pine with exposed rafters and painted collar ties, over an elevated framed floor, with wood railing and screened panels closing the perimeter.

We wanted the room to work past summer. Overhead radiant heaters, the fireplace, and a full screen wall extend the usable season well beyond a covered deck, while the vault and pale timber keep a north-facing space from feeling closed in.

Four months on, the household has a room that reads as part of the house rather than an attachment to it.

Services were run before the ceiling closed. A wired ceiling fan, a chandelier, two mounted radiant heaters, and concealed television and sound wiring all sit in a finished ceiling and stone face, which meant routing, blocking, and rough-in were resolved while the framing was still open rather than surface-mounted afterward.

Placement answered to the neighbors. Screening runs to full height on the exposed sides, seating faces inward toward the fireplace rather than out toward adjacent houses, and the railing height was set so the view lands on trees and hedging instead of rooflines.

Handover covered a tested fireplace and flue, commissioned heaters and lighting, screen panels checked for fit, and a documented punch list closed inside a week.

Inside This

From conceptualization to final delivery, we provide comprehensive solutions that transform raw potential into refined reality.

Behind the Build

A porch with a working fireplace in it is a building, not a cover, and it has to be built like one. Three things carried this addition.
Masonry Chimney and Flue

Masonry Chimney and Flue

A full-height stone stack with a firebox needs engineered footing, correct clearances to combustible framing, and an inspected flue, which is why the chimney was set before the roof went on rather than fitted into a finished structure.

Exposed Structure and Ceiling

Exposed Structure and Ceiling

Nothing in this ceiling is hidden, so rafter spacing, collar tie alignment, and pine layout were resolved on the framing drawings, because an exposed vault shows every variation that a drywall ceiling would have absorbed.

Concealed Services in Open Framing

Concealed Services in Open Framing

n, chandelier, heaters, television, and sound were all roughed in while the structure was open, giving the room real utility without a single visible conduit run across the timber or the stone.

 Frequently Asked Questions

How long does a screened porch addition take?

This one ran 4 months from foundation to final walkthrough. Comparable porch additions land between three and five months. A masonry fireplace is usually the longest item, since footing, clearances, flue, and inspection all sit in sequence, and a screened room without one is meaningfully faster.

Related Project

Ready to Start Your Remodel?

Tell us about your project and we will schedule a free inspection, then provide a clear, fixed estimate with no hidden fees. From design to final cleanup, your home is our responsibility.