The San Carlos Shaker Kitchen

The San Carlos Shaker Kitchen

A full kitchen rebuild in San Carlos, opened to the vault with white shaker cabinetry and matte black hardware.

Category :

Client Name :

The Navarro Family

Location :

San Carlos, California, USA

Total Duration :

3 Months

This kitchen came apart to the studs. New electrical, dedicated appliance circuits, and relocated plumbing went in first, followed by white shaker cabinetry with crown detail, a large working island, quartz counters, a white subway backsplash, and wood-look porcelain plank flooring.

Clarity mattered more than decoration here. Matte black hardware, iron cage pendants, and a stainless chimney hood give the white field enough contrast to read as a designed room. Open shelving niches interrupt the tall cabinet run, and we left the existing vault open so ceiling height carries across the island rather than stopping at a soffit.

Four now sit comfortably at the island, the work passed inspection under our California license, and the project closed right on the 3-month schedule with ongoing craftsmanship accountability built in.

Storage and surfaces drove the second half of the build. We framed the island as a freestanding run with base cabinets on both faces, seating clearance on the open side, and a quartz top mitered to a clean edge. The cooktop went to the perimeter wall, keeping the island free as a prep surface.

Sequence decided the rest. Sink, cooktop, and refrigerator landed inside a comfortable working triangle, with prep space falling between sink and range. Pendants run on their own switch so the island lights independently of the room, deep drawers went where daily items live, and the pantry stack absorbed dry storage the old plan never had.

Handover included a cleaned and tested space, documented punch list, and the daily photo record the family followed through every phase.

Inside This

From conceptualization to final delivery, we provide comprehensive solutions that transform raw potential into refined reality.

What This Kitchen Took

A single-room remodel lives or dies on sequence and tolerance. Three things carried this one.
Layout Before Demolition

Layout Before Demolition

We set the working triangle and island footprint on paper first, so cabinet quantities, appliance clearances, and seating depth were resolved before the first cabinet was ordered.

Cabinet Setting and Leveling

Cabinet Setting and Leveling

Every counter, backsplash, and crown line inherits the cabinet install, which is why our own supervisor signs off on level and reveal before quartz templating begins.

Sequencing Around Lead Times

Sequencing Around Lead Times

Cabinetry and quartz drive the schedule, not site labor, so we order early and stage demolition, rough-in, and tile against confirmed delivery dates.

 Frequently Asked Questions

How long does a kitchen remodel take on the Peninsula?

This project ran 3 months from demolition to final walkthrough. Most single-room kitchen remodels land between 8 and 12 weeks, and cabinetry and countertop lead times usually set the schedule rather than the site work. We order long-lead items first, then sequence demolition against confirmed delivery dates.